Макет Андижанской плотины The outleis are located in the body о! №е dam in the internal five sections and are arranged in three stages. The firsi stage has three temporary outlets [sections 18, 19 and 20 for letting through censtruction discharge and two permanent openings {sections 16 and 21). The second stage has five permaneni openings — one for water outle: and four spillways. The third stage contfains three free spillways for realising flood water. The designed discharge of the outlets into the headrace Canal is 230 cu.m per second and that of the spillways is 1,700 cu.m per second. The power house has a power capacity of 100,000 kW with a designed water discharge of 136 cu.m per second. The power station operates on the basis of the irrigation regimen. The volume of basic construction work for the headworks units is as follows: excavations — 3.15 million cu.m including 1.9 million cu.m of rock; con- crete and reinforced concrete — 3.7 million cu.m; metal structures — 110,000 {оп5. The total design cost of the project [storage and hydropower stalion] is 230 million roubles. 4 Model of the Andijan dam L Ly ey S i Magquette du barrage d’Andijan par deux tétes placées еп amont ef en aval. La largeur d'un élément au plafond est de 25 métres. Un rideau d'étanchéité monolithique d'une profondeur de 30 mefres sera établi a la base du barrage le long de toute la ligne йе charge, sous le pare- ment amont. La forte sismicité de la région (9 points) et la faible résistance de l'assise qui se compose de chloritoschistes quarizifiés imposent des exigences plus séveres pour ce qui est de la construction du barrage. Les ouvrages de vidange soni éfablis dans le corps du barrage a l'intérieur de la cavité de cing éléments, et ils se réparfissent sur frois éfages. Le premier étage comporte trois orifices provisoires [éléments 18 & 20] servanf a la dérivation des eaux pendanf les fraveaux, et deux pertuis définitifs (éléments 16 et 21].